收录期刊

    高级检索

    基于IFMS的官厅水库下泄影响分析评估

    Analysis and evaluation of the impact of Guanting Reservoir discharge based on IFMS

    • 摘要: 水库下泄影响评估是优化调度决策与下游灾害防控的关键基础,对识别防洪短板与制定治理措施具有双重科学价值。针对当前研究在泄流方案系统性评估与临界安全泄量反演方面的不足,以永定河官厅水库下游河段为研究对象,基于实测地形与水文数据,采用IFMS软件构建了水库下游21.113 km河道的一维水动力模型,分析计算了18种不同水库下泄方案下,下游河道沿程水位变化及其对沿岸村落和道路的影响,结果表明水库下泄影响对象主要为沿河低洼路段、河北怀来县幽州村和安家漩村,下游沿河道路、幽州村、安家漩村不受影响的安全泄量分别为175 m3/s、1 350 m3/s和1 980 m3/s。研究成果可为官厅水库的科学调度与运行管理提供重要决策依据和技术支撑。

       

      Abstract: Accurate assessment of the impact of reservoir discharge is the key basis for optimal scheduling decision-making and downstream disaster prevention and control, which has dual scientific value for identifying flood control shortcomings and formulating control measures. In view of the shortcomings of the current research in the systematic evaluation of discharge schemes and the inversion of critical safety discharge, this study took the lower reaches of Guanting Reservoir in Yongding River as the object. A 1D hydrodynamic model for the 21.113 km river channel downstream of the reservoir was developed using IFMS software, based on the measured topographic and hydrological data. Under 18 different reservoir discharge schemes, the change of water level along the lower reaches of the river and its influence on the villages and roads along the river were analyzed and calculated. The results show that the main objects affected by reservoir discharge are the low-lying sections along the river,Youzhou Village and Anjiaxuan Village. The uninfluenced safety discharges of downstream riverside roads, Youzhou Village and Anjiaxuan Village are 175 m3/s, 1 350 m3/s and 1 980 m3/s, respectively. The research results can provide important decisionmaking basis and technical support for the scientific scheduling and operation management of Guanting Reservoir.

       

    /

    返回文章
    返回