收录期刊

    高级检索

    大清河防洪“四预”数据底板建设思路与实践

    Design and application of "Four Preventions" data baseboard construction of flood control in Daqing River

    • 摘要: 大清河地跨山西、河北、北京、天津4省(直辖市),是京津冀协同发展、雄安新区千年大计等国家重大战略实施要地,其防洪安全已上升至政治高度。为落实国家“十四五”智慧水利建设要求,完善、提升大清河流域防洪安全体系和能力,系统梳理了大清河防洪“四预”(预报、预警、预演、预案)数据底板建设中对多源数据处理的实际需求;明确了数据汇聚、治理、存储、服务、传输、共享的全流程业务要求;提出了基础统一、多源汇聚、标准治理、高效并行的数据管理体系,满足不同信息体量和业务应用场景下对于数据传输和处理的多样需求;形成了包含基础数据、监测数据、业务数据、空间数据和跨行业共享数据五大类数据的多源多尺度流域级数据底板,实现了对大清河流域防洪“四预”功能及业务的系统支撑。相关技术成果在“23·7”大清河系特大洪水模拟复盘分析中得到了应用,可为全国其他流域数据底板建设提供借鉴和参考。

       

      Abstract: The Daqing River spans four provinces(municipalities) including Shanxi, Hebei, Beijing and Tianjin, is a key location for the implementation of major national strategies such as the coordinated development of Beijing, Tianjin and Hebei and the long-term development plan of Xiong'an New Area. Its flood control safety has reached a political level. To implement the national requirements for smart water conservancy construction during the 14 th Five-Year Plan period and to improve and to enhance the flood control safety system and capabilities of the Daqing River basin, this study systematically analyzed the actual data requirements for diverse data in the construction of the “Four Preventions”(forecast, warning, rehearsal, plan) flood control data baseboard for the Daqing River; it clarified the full-process business requirements for data aggregation, governance, storage,services, transmission, and sharing; proposed a data management system characterized by a unified foundation, multi-source aggregation, standardized governance, and efficient parallel processing to support diverse data transmission and processing needs under different information formats and business application scenarios; established a multi-source, multi-scale basin-level data baseboard comprising five major categories of data(basic data, monitoring data, business data, spatial data, and cross-industry shared data) to provide systematic support for the “Four Preventions” functions of flood control in the Daqing River basin. The relevant technical achievements were applied in the simulation and analysis of the “23·7” major flood in the Daqing River system, providing references and insights for the construction of digital systems in other river basins in China.

       

    /

    返回文章
    返回